Let's talk numbers—because at the end of the day, results matter. A mid-sized automotive parts plant I consulted with was struggling: high turnover, low output, and constant delays. They had the usual setup: fixed steel workbenches, parts in static bins, and workers walking an average of 2 miles per shift just to get materials.
We installed a
lean system with the components we've talked about:
lean pipe workbenches adjusted to each worker's height, flow racks for fasteners,
aluminum profile frames for tool storage, and roller tracks connecting stations. In three months:
Assembly time per unit dropped by 28% (from 45 minutes to 32 minutes)
Worker walking distance fell by 60% (from 2 miles to 0.8 miles per shift)
Error rates dropped by 22% (fewer mix-ups when parts are right at hand)
Turnover? Down by half. As one worker put it: "I don't go home exhausted anymore. That's why I'm staying."