Assembling a compatible Material Rack B is straightforward when you have the right parts. Follow these steps to ensure every component works together seamlessly:
1. Gather Compatible Components
Before you start, collect all necessary parts:
-
Basic aluminum tubes (t=1.2mm) for the frame
-
38mm white aluminum roller tracks (enough for 3 rows/floors)
-
90° aluminum pipe joints inside connection (for frame assembly)
-
Parallel aluminum joint A (for attaching tracks)
-
Anti-slip adjustable leveling feet or flat swivel casters
-
Plastic roller track guide rails (optional, for conveyor integration)
2. Build the Frame
Start by assembling the vertical frame tubes using 90° joints. Connect the horizontal supports to the vertical tubes to create the 3-row,3-floor structure. Tighten all joints with a wrench to ensure no wobbling—this is critical for stability under heavy loads.
3. Attach Roller Tracks
Use parallel aluminum joint A to fix the 38mm white roller tracks to the frame. Place the joints every 30cm along the track to ensure even support. Check that the tracks are straight—if they're misaligned, parts will jam. Adjust the joints as needed to get a smooth, level surface.
4. Add Accessories
If using casters, attach them to the base of the frame. Make sure they lock in place to prevent unintended movement. If using leveling feet, screw them in until the rack is stable on the floor—test this by pushing the rack gently; it should not rock. Add tray holders or guide rails if needed, using compatible
aluminum pipe accessories.
5. Test Compatibility
Slide a few parts along the roller tracks to ensure they move smoothly. Try repositioning a track using the parallel joints—this should be easy without needing extra tools. If you're integrating with a
conveyor, test the connection to make sure parts flow from the rack to the
conveyor without getting stuck.